英文合同范本 英文合同【实用5篇】

网友 分享 时间:

【导言】此例“英文合同范本 英文合同【实用5篇】”的文书资料由阿拉题库网友为您分享整理,以供您学习参考之用,希望这篇资料对您有所帮助,喜欢就复制下载支持吧!

英文合同【第一篇】

房地产买卖协议

SALES CONTRACT FOR REAL ESTATE

出售方:(以下简称“甲方” )

买受方: (以下简称“乙方” )

中介方:上海臣信房地产经纪有限公司 (以下简称“丙方” )

Seller: (hereinafter “Party A” )

Buyer: (hereinafter “Party B”)

Broker:Shanghai Chenxin Real Estate Co., Ltd. (hereinafter “Party C” )

经丙方中介介绍,甲、乙双方就上海市__________区__________路______弄__________号______室及__________车位(以下简称“该房地产”)的转让事宜,签订本协议,协议内容如下(有□选择的,以√为准):

With the introduction of Party C, Party A and Party B enter into the agreement concerning the transfer of ____ Suite and its ancillary carport located at ____ of _____ Alley, _____Avenue _____District of Shanghai (hereinafter as “Real Estate”) detailed as follows (“√” shall be filled in the corresponding“□”, if appropriate):

一、 该房地产基本情况

1. BASIC INFORMATION

1、 该房地产:房地产权证书号为:______________;房屋面积:____________平方米;车位面积:___________平方米。

2、 该房地产 □ 已 □ 未设定抵押。

3、 该房地产 □ 已 □ 未出租。若该房地产已出租,则甲方应保证承租人已经放弃优先购买权,若因承租人以优先购买权引发纠纷,则甲方愿意承担全部法律责任。

4、 有关该房地产的权属情况,若上述填写资料与实际情况不符或不详尽的,以上海市房地产登记簿记载的信息为准。

1) Certificate of title to this real estate is numbered as __________ with floor space of ______ ㎡and the related carport are ______ ㎡.

2) Mortgage is made on this real estate: □ Yes □ No.

3) This real estate has been leased: □ Yes □ No. If “Yes”, Party A shall guarantee that lessee has waived the right of preemption. Any and all legal liabilities arising out of or in connection with the exercise of such rights by lessee shall be borne by Party A.

4) If the title of this real estate mentioned above is not clearly indicated or is incorrect, information listed in the register of Shanghai Real Estate Office shall be applied.

二、 转让总价及定金与款项的`选择适用

2. TRANSFER PRICE AND DEPOSIT, OPTION OF PAYMENT

甲乙双方明确,该房地产的转让总价款:人民币大写_______________元(其中含车位转让款人民币___________元)。乙方于签署本协议时,支付诚意金人民币__________________ 元至中介方,并委托中介方与甲方洽谈;若甲方接受交易条件并签署本协议,则乙方委托中介方将诚意金转交给甲方作为款项。若至_ ___年_____月____日,甲方仍未签署本协议的,则乙方有权至中介方处无息取回诚意金;若乙方未按时取回诚意金,则视为继续委托中介方与甲方洽谈。本协议签订当日乙方直接向甲方支付款项人民币_____________________元。 甲方同意在本合同签订后 日内,乙方向甲方支付款项人民币元,该款项由乙方或乙方授权的其他人以现金方式交付或支付至甲方的指定账户,若采用支付至甲方指定账户的,下述账户已为甲方所确认:

户名:_________________ 账号:___________________ 开户行:________________

Party A and Party B expressly agree that the total transfer price of this real estate is CNY ________ inclusive of transfer price of carport as CNY _______. Party B agree that it shall pay Earnest Money as CNY ________ to Party C at this contract date and entrust Party C to negotiate with Party A. if Party A accept and sign this contract, Party B may authorize Party C to transfer such Earnest Money to Party A as deposit; provided, however, Party B may require the repayment of Earnest Money free of interests by Party C if Party A fail to sign this contract prior to ___________. In such event, it shall constitute that continue entrustment has been granted to Party C if Party B fail to take such Earnest Money in due time. Party B shall pay CNY __________ to Party A directly as deposit at this contract date. Party A agree that Party B may pay CNY __________ to it as deposit within ______ days from this contract date. Such deposit shall be paid in cash by Party B or its designee or made through T/T to the following bank account affirmed by Party A: Account Holder: ________Bank Account: _______ Bank Name: _________

三、 买卖交易细则

3. SALES RULES

1) 转让总价款:人民币大写_______________ _________元(其中含车位转让款人民币大写______________________ 元)。

2) 双方同意按以下方式支付款项:

第一笔房款: 甲、乙双方同意自《上海市房地产买卖合同》示范文本签订后_____日内,乙方向甲方支付的上述款项 人民币_________元作为乙方支付的首笔房款。

第二笔房款:乙方于______年_____月_____日前,支付甲方房款人民币___________________元。

第三笔房款:可按以下情况选择支付方式: □ 乙方通过银行按揭贷款的方式向甲方支付第三笔房款人民币__________________元,该款项由 银行在取得抵押人为乙方的他项权利证明后直接划入甲方帐户。 □ 甲乙双方同意共同至房地产交易中心办理该房地产过户手续,并取得房地产登记处的核发的收件收据后_____日内,乙方向甲方支付房款人民币________________元。

第四笔房款:□在办妥房屋交付手续当日,乙方向甲方支付房款人民币___________________元。 □甲乙双方同意,在签署买卖合同时将交房款人民币____________元交丙方监管至房屋交付手续办妥之日,丙方凭《房屋交接书》向甲方支付上述款项。

1) The total transfer price of this real estate is CNY ________ inclusive of transfer price of carport as CNY _______.

2) Such transfer price shall be made in installments as follows:

The first installment shall be made to Party A by Party B as CNY ________ (inclusive of deposit) within ______ days from commencement date of Sales Contract for the Real Estate Located in Shanghai City (“Sales Contract”).

The second installment as CNY ______________shall be made to Party A by Party B prior to ___________. The third installment may be made as follows:

□ CNY _________ as third installment shall be made to Party A by Party B through bank mortgage loans, which shall be directly paid to Party A’s bank account upon the certificate evidencing Party B as mortgagor has been presented to the lending bank, provided, □ Party A and Party B agree to fulfill the transfer formalities for this real estate before Real Estate Trading Center and Party B shall pay Party B CNY _____________ within _____days upon the certificate issued by real estate register has been fourth installment as CNY _____________ shall be paid. □ To Party A by Party B at the date on which the transfer formalities of this real estate has been fulfilled; or □ to Party A by Party C upon the receipt of Deed of Transfer if, as agreed by Party A and Party B, CNY _______ equal to such fourth installment has been delivered to Party C for escrow until the full fulfillment of transfer formalities.

3) 产权过户:待该房地产之抵押登记(若有)已经注销且乙方申请的按揭贷款(若有)经银行审核通过,具备过户条件具备后,最晚不迟于______年_____月_____日,共同至该房地产所在区交易中心办理房地产过户手续。

3)Transfer. Within _____ days upon the revocation of mortgage registration for this real estate (if any) and the loans acquired by Party B therefore (if any) satisfying the applicable requirements after the review of related bank (in no event late than _______), Party A and Party

B shall fulfill the transfer formalities before the trading center of that district where this real estate is located.

4) 房屋交付:甲方于收到乙方全部转让款项当日,将该房地产交付乙方,双方应签署《房屋交接书》。交付前的物业管理费及公用事业费由甲方承担,交付后的物业管理费及公用事业费由乙方承担。固定装修、附属设施设备以及经甲乙双方确认的家电、家具等价格已经包含在该房地产转让总价款内,甲方须保证该房屋内附属设施、设备均能正常使用及室内装饰与签订买卖合同之日的状况相符。

4)Delivery. At the date on which all transfer prices,party A shall deliver this real estate to Party

B and the Certificate of Transfer and Handover shall be concluded by the Parties therefore. Property Management Fees and Utilities Expenses arising out of or in connection with this real estate shall be borne by Party A prior to such delivery, or shall be borne by Party B upon such delivery.

Charges or expenses related to the fixtures and ancillary equipments & facilities of this real estate, as well as the prices of home appliances and furniture agreed by the Parties, have been included in the transfer price and Party A guarantee that all such ancillary equipments & facilities may work properly, all interior decorations thereof satisfy the conditions provided herein .

5)相关费用:Miscellaneous Charge.

[交易税费]:双方同意,交易中所涉及的上述买卖双方的税费由 □各自承担并支付;□由甲方承担并支付;□由乙方承担并支付。

[公证费]:若交易涉及买卖合同公证,费用由□双方分担并支付;□由甲方承担并支付;□由乙方承担并支付。

[中介报酬]:对于中介方提供中介服务所产生的报酬事宜,详见附件“中介服务确认书”。 Trade Tax. The Parties agree that any and all taxes and charges arising out of transaction hereunder shall be borne and paid by □ Party A; or □ Party B.

Notary Fees. Any notary fees arising out of or in connection with transaction hereunder shall be borne and paid by □ Party A; □ Party B; or □ Party A and Party B. Brokerage

fees. Brokerage feess paid to broker for any brokerage service provided shall be detailed in attached Schedule “Acknowledgement of Brokerage fees”。

四、法律责任的选择适用

4. APPLICATION OF LEGAL LIABILITIES

甲方保证该房地产产权清晰、权属明确,无异议登记、单方预告登记,无司法、行政查封等限制性交易情形存在;若因本条所述情况导致本协议效力瑕疵,甲方应返还乙方所有已付房款并赔偿乙方实际损失。

Party a guarantees that it has full and clear ownership to this real estate, which is free of any dispute registered, unilateral advanced registration, judicial or administrative attachment or other events restricting trades. If any defect affecting the validity of this Contract is occurred due to any misrepresentation hereunder, Party A shall refund all transfer prices paid by Party B, and indemnify any and all losses and damages suffered by Party B there-from.

五、争议解决

6. DISPUTE SETTLEMENT

各方在本协议履行过程中发生争议的,应友好协商;协商不成的,应向该房地产所在地人民法院起诉。

Any dispute arising out of or in connection with the performance hereof shall be settled by amiable negotiation, if fails, either Party may bring a lawsuit before the People’s Court with jurisdiction where this real estate is located.

六、合同效力

6. VALIDITY

本协议自甲、乙双方签署起对甲、乙生效,丙方签署后对丙方生效,一式三份,甲、乙、丙三方各执一份。

This Contract shall have binding force to Party A and Party B upon signatures of such two Parties are made hereon, and shall have binding force to Party C if signature of Party C is also made hereon. This Contract shall be executed in triplicate and each Party shall have one copy.

英文合同【第二篇】

marks 20xx

SHIPBUILDING CONTRACT

船舶建造合同

DATE:

BUYER: ************* (HERE AFTER CALLED “THE PARTY A”)

船东:**************(以下简称甲方)

ADD/地址:********************

BULDER:*************** (HERE AFTER CALLED “THE PARTY B”)

船厂:*****************(以下简称乙方)

ADD/地址:

IMPORT & EXPORT AGENCY: ****************(HERE AFTER CALLED “THE PARTY C”) AS THE AGENCY OF THE SHIPYARD

进出口代理方:****************(以下简称丙方)作为************的出口代理方

ADD/地址:************************

THIS AGREEMENT IS MADE BY BOTH ******AND ********。WHEREAS, THE PARTY

A DESIRES TO BUILD A ZC CLASS BULK CARRIER VESSELS OF ****TON (HERE IN AFTER CALLED “THE SHIP”) IN CHINA AND ENTRUSTS THE CONSTRUCTION TO THE PARTY B AGREES TO UNDERTAKE THE CONSTRUCTION OF THE SHIP.

:******因为公司发展需要,委托********建造一艘ZC级****吨散货船1艘,经过双方友好协商,达成如下共识。特签订如下船舶建造合同,以资双方共同遵守:

1.SHIP BUILDING CONTENT 工程内容:

THE SHIP SHALL BE USED BOTH AS A ZC LEVELS ****TON BULK CARRIER BASED ON THE DIMENSION AS SHOWN BELOW:

甲方委托乙方建造一艘ZC级****T散货船1艘,每台主尺度如下:

LOA: M

总长:米

BREADTH: M

型宽:米

DEPTH:

型深:米

DRAFT: M

吃水:米

CEMENT: TON

排水量:T

MAIN ENGINE: HP SHANDONG ZIBO/ONE SET

主机:山东淄博 马力一台

2.BUILDING PLAN:施工图纸

THE PARTY B SHALL BUILD THE SHIP ACCORDING THE FULL SET OF THE DESIGN DRAWING AND OTHER INVOLVED DOCUMENTS WHICH ARE APPROVED TO BE QUALIFIED

乙方提供的全套送审合格的`设计图纸及相关文件,进行施工建造。

PLAN NO:

图纸号:

3.BULDING COST: 工程总造价

USD ***** (SAY US DOLLAR ********ONLY)

美元叁拾壹万伍仟壹佰柒拾伍整

4. PAYMENT: 付款方式:

THE PARTY A SHALL REMIT THE BUIDING COST TO THE DESINGNATED BANK ACCOUNT BY THE PARTY B AS SHOWN BELOW.

甲方直接至乙方银行帐号。

BANKING INFORMATION:

账户如下:

NAME OF BANK: *********

开户银行:

ACCOUNT NUMBER:

银行帐号:

BENEFICIARY:

收款单位:

BANK ADD:

银行地点:

SWIFT CODE:

银行编号:

FIRST PAYMENT: USD (SAY US DOLLARS ONLY) SHOULD BE PAID WITH IN ** DAYS AFTER THE CONTRACT HAVE BEEN SIGNED.

第一款:本合同签字后**日内支付美元***********整。

LAST PAYMENT: USD****** (SAY US DOLLARS***********ONLY) SHOULD BE PAID BEFORE OR ON 30TH DECEMBER 20xx.

尾款:交船时支付美元贰拾壹万伍仟捌佰伍拾整。

英文合同【第三篇】

Compensation Trade Contract

This contract is hereby made and entered into between Guangdong Jiaxing Industrial Co.,Ltd.(hereinafter referred to as Party A) and Tailong Electronics(Singapore) Co., Ltd.(hereinafter referred to as Party B) on October 12,1995 in Guangzhou, China on the basis of equality and mutual benefit and through amicable consultation.

Party A: Guangdong Jiaxing Industrial Co., Ltd.

Add:317 Huanshi East Road,Guangzhou,China

Tel: (020) 87786162

Fax: (020) 87619503

Party B: Tailong Electronics (Singapore) Co., Ltd.

Add:111North Bridge Road,Singapore

Tel: (65) 3324951

Fax: (65) 3324928

1. Contents of Transactions

Party A agrees to buy from Party B and Party B agrees to sell to Party A Assembly Lines for Color TV Sets, whose specifications, technical requirements, price and delivery schedule shall be specified in an additional contract to be made between both parties, which shall serve as an integral part of this contract.

Party B shall buy from Party A Color TV Sets turned out on the Assembly Lines supplied by Party B in an amount approximately equal to that of the Assembly Lines. The quality, quantity, unit price, packing and delivery schedule shall also be specified in an additional contract, which shall constitute an integral part of this contract.

2. Terms of Payment

Payment of the transactions stipulated in Article 1 shall be effected by reciprocal Ls/C. Party A shall open a usance L/C in favor of Party B to pay by installments the entire cost of the Assembly Lines to be supplied by Party B; whereas Party B shall open a sight L/C in favor of Party A to pay each shipment of Color TV Sets to be delivered by Party A. The tenor of the usance L/C shall be in consistence with the term of compensation stipulated in Article 3. The total proceeds received by Party A from selling Color TV Sets to Party B within the duration of this contract shall be equal to, and used to cover, the total value of the Assembly Lines. In case the total proceeds received by Party A from selling Color TV Sets to Party B is not enough to cover the total value of the Assembly Lines, the balance shall be made up by Party B with down payment before the usance L/C opened by Party A expires, thus enabling Party A to effect payment due under the usance L/C.

3. Term of Compensation

Party A shall pay the total cost of the Assembly Lines by exporting Color TV Sets to Party B within 10 months from the 4th month after all parts of the Assembly Lines are delivered. In principle, the amount to be paid by Party B for its imports from Party A per month shall be 10 percent of the total amount due to be paid for the Assembly Lines. Party A can make payment ahead of schedule with a notice to Party B 1 months in advance.

4. Currency for Pricing

Both the Assembly Lines and the Color TV Sets shall be priced in terms of US Dollars. If the Color TV Sets are also to be sold on the home market within the term of compensation and thus have a price in RMB, their export price shall be its equivalent in US Dollars according to the exchange rate then prevailing.

5. Interest Rate

Party A shall bear the interest on the usance L/C and the down payment of Party B. The annual interest rate is agreed up on at %.

6. Technical Service

After arrival at the destination, the Assembly Lines shall be installed by Party A. When Party A believes it is necessary, Party B shall send its technicians to provide on-the-spot instructions and other technical assistance in the course of installation. Party B shall be liable for expenses of the technicians and losses incurred in the course of installation as a result of technical default on its part.

7. Insurance

The buying and selling of the Assembly Lines and the Color TV Sets shall be on FOB basis, thus the ocean marine cargo insurance on them shall be effected by Party A and Party B respectively.

In the duration of this contract, the Assembly Lines shall be insured by Party A. Should any loss or damage occur, Party A shall lodge claims against the insurer and pay a part of the indemnification received from the insurer to Party B, which shall be in proportion to the payment Party A has not made for the part of machinery involved in the loss or damage.

8. Liability for Breach

Either party shall be liable for its breach of contract and indemnify for all losses thus incurred to the other party. In addition, the breaching party shall pay to the other party a fine, which shall account for 15% of the total amount involved.

9. Performance Guarantee

To guarantee the implementation of the contract, each party shall submit to the other a performance guarantee issued by a bank agreed by both parties. The guarantee bank of Party A is The Bank of China, Guangzhou Branch, while that of Party B is Sanwa Bank.

10. Force Majeure

Either party shall not be held responsible for failure or delay to perform all or any part of the contract due to flood, fire, earthquake, draught, war or any other events which could not be predicted at the time of conclusion of this contract, and could not be controlled, avoided or overcome by the relative party. However, the party affected by the event of Force Majeure shall inform the other party of its occurrence in writing as soon as possible and thereafter send a certificate of the event issued by the relevant authorities to the other party within 15 days of its occurrence.

If the event of Force Majeure lasts over 120 days, both parties shall have the right to terminate the contract.

11. Arbitration

disputes arising from the performance of this contract shall be settled through friendly negotiations. Should no settlement be reached through negotiation, the case shall then be submitted for arbitration to the China International Economic and Trade Arbitration Commission (Beijing) and the rules of this Commission shall be applied. The award of the arbitration shall be final and binding upon both parties. The arbitration fee shall be borne by the losing party unless otherwise awarded by the commission.

During the course of the arbitration, the contract shall be performed except for the part under arbitration.

12. Amendment to the Contract

The contract can be amended only after the amendment is agreed upon by both parties.

13. Language and Validity

The contract shall be written in Chinese and English. Both versions are equally authentic. In the event of any discrepancy between the two versions, the Chinese version shall prevail.

The contract shall come into effect as soon as it is duly signed by both parties and shall remain effective for two years.

Party A: Guangdong Jiaxing Industrial Co., Ltd

(Signature)

Party B: Tailong Electronics (Singapore) Co., Ltd

(Signature)

英文合同【第四篇】

RETAINING CONTRACT

法律顾问合同

By and between

签约方

Client

当事人

And

Chongqing Guangxian Law Offices

重庆广贤律师事务所

November, 20xx二O一三年十一月

目录

1. The Parties 缔约方 ........................................................................ 3

2. Backgrounds缔约基础 .................................................................. 3

3. Services Rendered服务内容与责任 ............................................. 4

4. Litigation or Arbitration Service诉讼和仲裁服务 ....................... 5

5. Obligations of Client当事人的义务 ............................................. 6

6. Fee and Payment顾问费用与支付 ............................................... 6

7. Work Implementation 工作方式 .................................................. 7

8. Remedies 违约责任 ...................................................................... 7

9. Supplementary Agreements 补充协议 ......................................... 8

10. Miscellaneous一般约定 .............................................................. 8

RETAINING CONTRACT

法律顾问合同

Contract Number: 合同号

1. The Parties 缔约方 People’s Republic of China as of is entered into by and between:本服务合同(以下简称合同)于20xx年11月6日在中华人民共和国重庆市由以下双方订立:

(“Client”) 重庆当事人(以下简称当事人)

And 和

Chongqing GuangXian Law Offices (“Guangxian”), a recorded law firm underlaws of People’s Republic of China of which address is 162 3rd Zhongshan Lu, Eich Int'l Plaza 16/F, Yuzhong District, Chongqing, 400015, People's

Republic of China重庆广贤律师事务所(以下简称广贤),系根据中华人民共和国法律成立的注册律师事务所,地址位于重庆市渝中区中山三路162号中安国际大厦16层,邮编:400015

Client and Guangxian shall hereinafter be referred to individually as the "Party"and collectively as the"Parties". 当事人和广贤可单独称为“一方”,合称为“双方”。

2. Backgrounds缔约基础

In accordance with the Lawyers Act and Contract Act of the People’s Republic

of China, Client engages Guangxian as its retained Attorneys to deal with legal affairs in its business operation.根据《中华人民共和国律师法》和《中华人民共和国合同法》,当事人聘请广贤处理法律事项。

Guangxian agrees to accept such engagement as stipulated in the last paragraph.

广贤同意接受前述聘请。

INWITNESS THEREFORE, The Parties hereby agree as follows: 为此,双方特此订立如下条款:

3. Services Rendered by Guangxian to Client 广贤的服务内容与责任

Important Contract Review or Draft重大合同审查或起草

According to Client’s request Guangxian shall legally review or draft contract

documents for any kind of routine business including but not limited to the guarantee contract, loan contract, construction contract, technology contract, intellectual

property transfer or license contract, materials procurement contract, product sales agreement, service contract, labor contract etc. for Client without specialized project contract;应当事人要求,对当事人拟签订各类重要合同,包括但不限于担保合同、贷款合同、建设工程合同、技术合同、知识产权转让、许可使用合同、物资的采购协议、产品经销协议、产品服务协议、劳动合同、劳务合同,进行法律审查或起草合同文本,但属于专项法律服务内容的除外;

Internal Rules and Regulations Review 制度审查

According to Client’s request Guangxian shall review any important internal rules and regulations relevant to its employees, sales contributor, supplier or based on any legal or regulatory rules including environmental protection, fire fighting, accounting or financial issues;应当事人要求,就当事人内容涉及当事人与其员工、经销商、供应商或根据法律法规或监管规则(例如:环境法规、消防法规、会计法或会计规则、财政税法等)要求建立的,重要规章制度进行法律审查。

Attorney’s Opinions 法律意见

According to Client’s request, Guangxian shall submit opinions for any issue revolved in Client’s business and internal management. 应当事人要求,就当事人业务活动和内部经营管理中涉及的法律问题提供法律意见。

Attorney’s Letter发出律师函

According to Client’s request, to resolve all relevant disputes of both internal and outside business with Attorney’s Letter to Client’s debtor or relevant party.

应当事人要求,就当事人在业务活动及内部经营管理活动中出现的各类纠纷提供咨询意见或建议,发出律师函。

Legal Training法律知识培训

In accordance with Client’s request, Guangxian shall provide legal training for

Client’s relevant employees.应当事人要求,对当事人的相关人员进行法律知识和运用技巧的培训或举办法律讲座。

Documents Legal Review文件的法律审查

In accordance with Client’s request, review or draft any documents with legal binding force or take any obligation, including but not limit to post, publicity, representation, advertisement words, external promise or bids;

应当事人要求,就当事人对外发布的具有法律约束力或以承担一定义务为内容的文件,包括但不限于公告、公示、声明、广告语、对外承诺、招标文件等,进行法律审查或拟定相关文本。

Deals Introduction

In accordance with the request of Client, recruit and introduce any partner or investment for Client, supply any operational project or relevant information;

根据当事人的要求,招募并引荐合营或合作伙伴或投资者(以下简称引荐客户),招募并引荐经营项目或提供相关信息;

Monthly Report

Provide legal information pertained to the business of Client. Such kind of report shall be delivered monthly.

为当事人经营活动按月提供法律信息。此类报告应当按月提供。

4. Litigation or Arbitration Service诉讼和仲裁服务

Guangxian’s service shall exclude litigation or arbitration. Client may consult

Guangxian for general analysis of any litigation before brings lawsuit or within three days after receiving a court summons. Guangxian shall supply legal

consulting service based hereunder.

广贤律师提供的其它法律事务服务不包括诉讼仲裁业务,当事人诉讼业务

英文合同【第五篇】

party a:party b:

contract no

date:

signed at:

witnesses that the party a for considerations hereinafter named, contracts and agrees with the party b that party a will, within_____ days, next following the date hereof, build and finish a libarary building for party b. ( the building hereinafter is referred to as the said building.) the said building is of the following dimensions, with reinforced concrete, brick, stones and other materials, as are described in plans and specifications gereto annexed.

in consideration of the foregoing, party b shall, for itself and its legal representatives, promise to pay party a the sum of one million rmb yuan in manner as follows, to wit:

rmb_____at the beginning of the said work.

rmb_____on _____/ _____/_____( for example: 3/21/XX)

rmb_____ on_____/ _____/_____

rmb_____ on_____/ _____/_____

rmb_____ on_____/ _____/_____

and the remaining sum will be paid upon the completion of the work.

it is further agreed that in order to be entitled to the said payments ( the first one excepted, which is otherwise secured ), party a or its legal representatives shall, according to the architects appraisement, have expended, in labor and material, the value of the payments already received by party a, on the building, at the time of payment.

for failure to accomplish the faithful performance of the agreement aforesaid, the party so failing agrees to forfeit and pay to the other_____rmb yuan as fixed and settled damages, within one month form the time so failing.

in witness whereof we have hereunto set our hands and seals the day and year first above written.

signed, sealed and delivered

in the presence of

party a : party b:

50 2960758
");